摘要 |
PROBLEM TO BE SOLVED: To easily build a frame for power generation equipment for a short period, even if the structure of a steel form is complicated. SOLUTION: Steel forms 31f to 37f of beams 31 to 37 adjacent one another are connected in the frame 1 for power generation equipment. An installation height of each haunch 4 for a column 2 is set to be substantially the same level. The steel forms 31f, 33f, 34f, 35f and 37f of the beams 31, 34, 33, 35 and 37 are formed so that the beam height at the center may be different from the beam heights of other beams 32 and 36. As a result, the frame 1 for power generation equipment can be easily build for a short period, although the structures of the steel forms 32f, 35f and 37f are complicated.
|