摘要 |
PROBLEM TO BE SOLVED: To design production process in accordance with the change in working hour of operation process. SOLUTION: A step to prepare work content on a plurality of work processes, a step to prepare the working hour of every work tool, a step to input limiting conditions on the production process, a step (S102) to decide the work tool which is used in each work process, a step (S104) to read the working hour based on the decided work tool, a step (S106) to calculate the working hour on the production process, a step (S132) to design the production process by figuring out production capacity on the production process based on the calculated working hour and the inputted limiting conditions are included in the process designing method. |