摘要 |
<p>The transport system for massive drums comprises a series of rest stations and support stations. The support stations and rest stations are mounted alternately along the girder. The girder is carried on at least two jacks (4,4') which are used to adjust its level. These jacks are operating in synchronism with the guide system which enables the girder to be moved horizontally carrying the spools The transport system for massive drums of coiled metal during manufacture comprises a series of rest stations (30 - 33) centred on a longitudinal vertical plane, and a support girder (1) centred on the same longitudinal plane. Along this plane there is also a series of return stations (21 - 24). Each rest station consists of four support feet having upper surfaces which are inclined in such as way as to provide a stable location for a cylindrical spool with its axis horizontal. Support stations have four similar support feet. The support stations and rest stations are mounted alternately along the girder. The girder is carried on at least two jacks (4,4') which are used to adjust its level. These jacks are operating in synchronism with the guide system which enables the girder to be moved horizontally carrying the spools.</p> |