发明名称 |
EMBEDDING METHOD FOR READY-MADE PILE |
摘要 |
PROBLEM TO BE SOLVED: To increase a vertical load that can be borne by one pile by transmitting the load to the original ground from recessed and projected portions near the tip portion of the ready-made piles without generating a great amount of excavated slurry. SOLUTION: Excavated bore hole is made at a pile main body portion and an enlarged bottom portion. Within the excavated bore hole, a ready-made pile having ring-shaped recessed and projected portions at the tip portion is lowered and cement milk is filled. The ring-shaped recessed and projected portions are arranged inside the enlarged bottom portion of the excavated bore. When a vertical load acts to the ready-made pile, the load is transmitted at the peripheral edge of the ring-shaped recessed and projected portions of the ready-made pile.
|
申请公布号 |
JP2001271344(A) |
申请公布日期 |
2001.10.05 |
申请号 |
JP20000088284 |
申请日期 |
2000.03.28 |
申请人 |
ASAHI KASEI CORP |
发明人 |
KUNIMATSU SATOSHI;YAMATO SHINICHI |
分类号 |
E02D5/48;E02D5/44;E02D5/50;(IPC1-7):E02D5/48 |
主分类号 |
E02D5/48 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|