摘要 |
PROBLEM TO BE SOLVED: To save space and reduce cost by effective utilization of the space for placing materials, products and skeltons. SOLUTION: A skelton space 3 and material space 5 are laid serially next to a plate processing machine 1. A material carry-in device 7, carrying a material W into the plate processing machine 1, and a loader 11, equipped with a clamp 65 for carrying out skelton which is used for clamping skelton after being fabricated, are freely travelably installed between the plate processing machine 1 and the skelton space 3 and material space 5. In this arrangement, only one loader 11 is used for carrying the material W and skelton so that it is advantageous to cost-down and space saving. In addition, a product space 13 is placed next to the plate processing machine 1, and an unloader 15 for carrying out product G is installed at the space between the product space 13 and the plate processing machine 1.
|