摘要 |
PROBLEM TO BE SOLVED: To prevent a generation of situation that a truck is waited for a long time by providing a step of determining the maximum value of the maximum value of capacity of a high speed storage container and a low speed storage container required for respective products as a capacity of the high speed storage container and the low speed storage container required for the respective products. SOLUTION: The kind of products is taken as i. A transferring operation time zone of one day is divided at every b minute and each time zone is defined as j. A product collected corresponding to each nb minutes, i.e., a time of n magnification of unit time is stored in a high speed storage container and a low speed storage container. A calculation is carried out regarding various shipment quantity distributions A (i, j) of one day considered to be varied due to a season variation, etc. An accommodation capacity of every respective products of the high speed storage container and the low speed storage container required corresponding to the respective different shipment quantity distribution A (i, j) of one day is determined and the maximum value of every products is determined. Thereby, the accommodation capacity of every respective products of the high speed storage container and the low speed storage container finally required is determined. A capacity of the respective storage containers is determined based on these accommodation capacity. |