摘要 |
PURPOSE: An internet gauge examination method of various building gauges is provided to receive and process a lot of gauge data in sequence in a short time on the basis of intrinsic numbers of users by using internet. CONSTITUTION: An internet gauge examination method of various building gauges includes the steps of adding and storing a pulse signal input from a gauge(1) via an interrupt port to a gauge examination microcomputer(4) and returning to a stop mode for minimizing current, storing a one-month added value with an assigned time at the assigned gauge examination time, setting a transmission starting time of each gauge and automatically transmitting a predetermined gauge examination data to an internet server in sequence, repeatedly carrying out the transmission by three times if any reception message is not received from the internet server, and arranging and storing the received data in the database according to the intrinsic gauge number by a host server computer(8) while automatically transmitting an error message to a server computer of a gauge examination microcomputer company with relation to a gauge of which gauge data is not received, wherein time of the gauge examination microcomputer and the server computer are set equally.
|