PROBLEM TO BE SOLVED: To efficiently carry out muck by reducing an idle time until muck is loaded onto the next truck after muck is loaded onto a truck in the carrying- out method for muck by a muck loader. SOLUTION: A chute 12 in which an endless belt is installed onto a roller conveyor is arranged on the discharge side of a conveyor 2 for the muck loader in a vertically inclinable manner. When muck is carried out, muck falling from the discharge end of the conveyor 2 is loaded onto a truck 3 standing by on the discharge side of the chute 12. An empty another truck 3' is made to stand by in parallel until loading to the truck 3 is completed, and the chute 12 is tilted in the opposite direction and muck is loaded successively onto the truck 3' when loading to the truck 3 is completed.
|