摘要 |
PROBLEM TO BE SOLVED: To provide a structural body aligning construction method capable of easily correcting the vertical misalignment caused at the time of installation by adopting the construction method to use a suspending device with a suspending machine and install an upper structural body suspended from the suspending device on a lower structural body and by operating the suspending machine. SOLUTION: When an upper structural body 7 is constructed on a preinstalled lower structural body 6, the upper structural body 7 is suspended supportedly from a suspending device having a plurality of suspending machines at equal intervals, and a misalignment caused between both structural bodies when the lower part of the upper structural body 7 is moved closely to an upper edge of the lower structural body is corrected by rotating upward the upper structural body 7 on the opposite side by the operation of the suspending machines starting from a flange 12 of the upper structural body 7 displaced to the outside from the upper edge of the lower structural body 6 so as to align the lower edge 70 of the upper structural body on a start side with the extension line of the upper edge of the lower structural body 6. In this state, the upper and lower structural bodies are locked with fixing pins, and then the upper structural body 6 is lowered and installed.
|