发明名称 NMR interpretation technique using error minimization with variable T2 cutoff
摘要 This invention provides improved geological formation evaluation, resulting in a more accurate prediction of the location of hydrocarbon. It also increases the yield at those sites. The disclosed method involves determination by a nuclear magnetic resonance tool of a downhole T2 distribution, determination of T2 cutoff valves at discrete points in the borehole, and deriving a variable T2 cutoff time by either linear or non-linear correlations. Derivation of these variable T2 cutoff times provides the likely location of high irreducible water saturation, even where large quantities of movable water reside nearby.
申请公布号 US6072314(A) 申请公布日期 2000.06.06
申请号 US19970931539 申请日期 1997.09.16
申请人 HALLIBURTON ENERGY SERVICES, INC. 发明人 ORABY, MOUSTAFA
分类号 G01N33/24;G01R33/44;(IPC1-7):G01V3/00 主分类号 G01N33/24
代理机构 代理人
主权项
地址