发明名称 |
CONSTRUCTION METHOD OF FLOOR PANEL AT END PORTION OF BRIDGE USING PRE-CAST |
摘要 |
PURPOSE: A pre-cast concrete floor for the end of a bridge that contains simplified construction process and construction method thereof is provided. CONSTITUTION: A construction of a pre-cast concrete floor for the end of a bridge contains the steps of: establishing a pre-cast concrete floor(1) on a mold, applying a pre-stress(2) to a throttle direction to secure an integration between floors and to improve fatigue resistance, and connecting a floor(6) of the end established on the upper part of a strut of the bridge to a pre-cast pre-stressed concrete floor by a junction. Because many shear junction materials are arranged on the end floor, a shear pocket(8) is formed to be larger than a shear pocket(11) of the pre-cast pre-stressed floor for storing the shear junction materials. Herein, a main steel reinforcing(9) over the shear pocket is exposed.
|
申请公布号 |
KR20000026187(A) |
申请公布日期 |
2000.05.15 |
申请号 |
KR19980043608 |
申请日期 |
1998.10.19 |
申请人 |
DAEWOO CO., LTD. |
发明人 |
PARK, CHIL RIM;KIM, SEONG UN;KIM, YEONG JIN;JEONG, CHEOL HEON;JANG, SEONG UK;YUN, SEOK GOO |
分类号 |
E01D19/12;(IPC1-7):E01F19/12 |
主分类号 |
E01D19/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|