发明名称 TUNNEL CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a tunnel construction method capable of constructing a tunnel by using all banking materials such as sandy soil, cohesive soil and crushed rocks existing in the circumference of the planned site of a tunnel, not requiring execution by solidification material of soil cement stabilization processing or the like in order to construct the tunnel such as an intersection road and a water passage by road filling. SOLUTION: A foundation part placing a rod-like reinforcing member 10 is formed on a ground surface for tunnel construction, and whenever a constant amount of filling for the ground surface is filled, the rod-like reinforcing member 10 is placed or set on the circumference of the outer periphery of a tunnel construction planned part to form the reinforcing body 50 of the tunnel construction planned circumference. The tunnel is constructed by excavating the tunnel construction planned part of the reinforcing body.
申请公布号 JP2000087372(A) 申请公布日期 2000.03.28
申请号 JP19980261166 申请日期 1998.09.16
申请人 KENSETSU KIKAKU CONSULTANT:KK 发明人 NISHINAKAMURA KAZUTOSHI
分类号 E21D9/04;E02D29/045;(IPC1-7):E02D29/045 主分类号 E21D9/04
代理机构 代理人
主权项
地址
您可能感兴趣的专利