摘要 |
PROBLEM TO BE SOLVED: To decide a sequence of production for reception of a large quantity of orders in consideration of the panel machining time by producing the ordering data to which the loading sequence information and the loading pallet information are added and storing the ordering data. SOLUTION: A production sequence decision part 5 decides a production sequence of panels based on the data stored in a member constitution data storage part 2 and a machining data storage part 3, and this panel production sequence is stored in a production sequence storage part 6. Then an ordering destination code is obtained from the item information stored in an item data storage part 4 based on the slave number that is contained in the member production sequence order data stored in the part 6. Meanwhile, the ordering data to which the loading sequence information and the loading pallet information decided at a loading sequence/loading pallet decision part 7 are added are produced by an ordering data production part 8. Then the produced ordering data are stored in an ordering data storage part 9. |