A coal-fired steam power plant includes a steam turbine (2) connected to a steam generator (22) through a condensate and feedwater course. In order to assure the least possible installation expense, the condensate and feedwater course includes a preheater heating surface (36) that is disposed, in addition to an air preheater (34), in the steam generator.