发明名称 |
CONSTRUCTION METHOD FOR POROUS PIPELINE FOR C.C.BOX |
摘要 |
<p>PROBLEM TO BE SOLVED: To provide a construction method for a porous pipeline for a C.C.Box for a porous pipeline which becomes an underground buried wire combined groove. SOLUTION: In a porous pipeline for concrete precast C.C. Box used in a underground buried wire combined groove works, designated digging is performed and a precast foundation plate is laid on a foundation crushed stone which is subjected to leveling of ground and rolling. A porous pipe block groups 1' formed by assembling required number of arrays porous pipe blocks 1 and integrating the same by a suspension jig 6 special for seveal blocks is lifted by a heavy machine and installed, and subsequently the jig special for several blocks is removed to perform designated back filling.</p> |
申请公布号 |
JPH10195852(A) |
申请公布日期 |
1998.07.28 |
申请号 |
JP19970001301 |
申请日期 |
1997.01.08 |
申请人 |
KOKEN SANGYO KK;SUMIKEN CONCRETE KOGYO KK;HAKKO CO LTD |
发明人 |
MATSUMOTO KOJI;KOBAYASHI KEIICHI;KONDO JIRO;YANAKA HISAYUKI;KOGA MOTOYUKI |
分类号 |
E02B9/06;E02F5/10;F16L1/00;F16L1/038;H02G1/06;(IPC1-7):E02B9/06 |
主分类号 |
E02B9/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|