摘要 |
<p>PROBLEM TO BE SOLVED: To obtain a method and an apparatus which increase the working efficiency of a cable laying construction operation, in which a high-place operation is eliminated and which enhance safety. SOLUTION: In a cable laying method, a traction rope 30 is passed through a plurality of guide pulleys 24 which are fixed to a guide rope 20 at prescribed intervals, the guide rope 20 and the guide pulleys 24 are sent out form one pole toward an adjacent pole, also the traction rope 30 is sent out simultaneously, the guide rope 20 is stretched between both poles, a cable is connected to one end of the traction rope 30, and the cable is pulled along the respective guide pulleys 24 through the traction rope 30.</p> |