摘要 |
PURPOSE:To provide the optimum solution by making a layout calculation based on the data of the construction surface, and calculating the difference with the evaluated value based on the information of the evaluation priority of factor items such as the joint width on the layout area. CONSTITUTION:The specification of the tile itself and the data on the construction surface obtained from a construction body are inputted, and a layout calculation is processed in a short time. Items on layout such as the cut object and joint width are corrected according to priority in place of the layout calculation by only the information of the construction surface based on the data on the tile and a construction object. The optimum solution is obtained for correction based on the numerical difference between the calculated result by a layout calculation process section 1 and the evaluation criteria of an evaluated value calculation section 5 on evaluation items. The optimum layout calculated value is obtained, and the work time of the layout calculation can be sharply shortened. |