摘要 |
PURPOSE:To provide an operation schedule determining device for a lifting and transporting device by which a proper operation schedule can be determined according to a working schedule condition or the like. CONSTITUTION:Priority is given (step 150) respectively to plural inputted working schedules (referred to as task) of a lifting transporting device, and when prolongation or the like of operation time is necessary for the working schedules, the operation time is set so as to be prolonged (step 152-160). Next, judgment is made (step 162) on whether an operation schedule is created or not by either one of inference modes of 'demand respecting type', 'leveling type' and 'packing type', and when the inference mode is the 'leveling type' or 'packing type', preprocessing is carried out in response to the respective modes (step 164 or 166). Next, a length of the operation time is judged (step 168), and competition eliminating processing A or competition eliminating processing B is carried out (step 170 and 172) according to the length of the operation time so that overlapping (competition) of tasks is eliminated. |