摘要 |
PURPOSE:To make construction period shorter by a method wherein a frame structure of substructure work which is of reinforced, steel framed construction and of SRC construction is formed on a foundation embedded in the ground and an upper supporting stage is disposed on said framed structure, whereby the substructure work and superstructure work are constructed simultaneously. CONSTITUTION:A framed structure of a substructure work 1 of SRC construction is formed from reinforcing bars 12 and steel frames 13 on a foundation 11 embedded in the ground. Next, an upper supporting stage 14 is disposed on a framed structure of SRC construction. And a head part of main girder column 16 is formed on the stage 14, while concrete is cast into the framed structure of the substructure work 1. As a result, the whole construction period can be made shorter. |