摘要 |
<p>PURPOSE:To obtain a highly reliable predicted value by eliminating an error in manual calculation and a decrease in operation efficiency. CONSTITUTION:When software production project and production schedule values are inputted from a keyboard 1, data on them are stored in an auxiliary storage part 3. Then production data values are inputted periodically and stored in the auxiliary storage part 3. A processing part 2 reads necessary data out of the auxiliary storage part 3 and analyzes them. The analysis result is stored in the auxiliary storage part 13 and graph conversion based upon the processed data is performed to display the result at a display part 4. Further, calculation instruction parameters are optionally set on the keyboard 1 to perform various analysis processing.</p> |