摘要 |
<p>PURPOSE:To shorten a processing time necessary for leveling a load by calculating the movable range of a moving work in which the change of a work starting time is permitted, deciding the moving destination time of the moving work out of it and updating the movable range of the same kind of a work as the moving work to be moved. CONSTITUTION:By using a movable range calculating means 107, the movable range is calculated as to each unit work of the work in which the change of the work starting time is permitted, next, a moving is executed to the unit work of the narrowest movable range by a moving destination time deciding means 108, and the load is leveled. When the leveling of the load is incomplete, the movable range is updated only as to the unit work contained in the work before the division of the unit work to be moved by using a movable range updating means 109, and again, the load is leveled by the moving destination time deciding means 108. Thus, the load leveling processing can be executed in a short time.</p> |