发明名称 Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining
摘要 The underground tunnel is for road traffic etc. and is formed using a pasty material to constitute an intermediate layer between the rock and the lining. This layer supports the thrust from the ground and is placed in position during excavation. - The intermediate layer is formed in advance of the lining and in the space between the rock and intermediate formwork on the onside, and covering at least the section which is to receive the layer. The lining is formed in-situ by concreting between this intermediate formwork, which is moved as concreting progresses, and internal formwork.
申请公布号 BE901814(A4) 申请公布日期 1985.06.17
申请号 BE19850214564 申请日期 1985.02.25
申请人 DYCKERHOFF & WILDMANN AKTIENGESELLSCHAFT 发明人
分类号 E21D9/06;F16L9/22;(IPC1-7):E21D/;F16L/ 主分类号 E21D9/06
代理机构 代理人
主权项
地址