发明名称 CONSTRUCTION OF DAM
摘要 PURPOSE:To make the construction of a dam easier by a method in which filling soil is packed into a rectangular cell formed by driving sheet piles from the entrance side to form a temporary dam, and the same rectangular cells are further formed, and an upper concrete is placed on them. CONSTITUTION:Two steel plates are projectionally provided from a quaywall 1 as an entrance side, sheet piles 2 are driven for a given distance to form a rectangular cell C in the direction of crossing the direction of construction, and soil is packed into a filling space B so formed. Reinforcing bars 5 are set along both outsides of the sheet piles 2 driven in parallel with the direction of construction, underwater concrete 6 is placed on them for covering, and concrete 7 is also placed on the soil 4 to construct a part A of the dam. Using the part A of the dam as a temporary dam, a part A' of the dam is likewise constructed, and parts A'' and A''' of the dam are orderly constructed in the same way to complete the whole of the dam.
申请公布号 JPS6023507(A) 申请公布日期 1985.02.06
申请号 JP19830131763 申请日期 1983.07.19
申请人 SHINWA KOUSETSU KK 发明人 NAKAGAWA HIDETAKA
分类号 E02B3/06;E02B3/04;E02B3/10 主分类号 E02B3/06
代理机构 代理人
主权项
地址