发明名称 A METHOD OF GENERATING STEAM
摘要 <p>The optimum cycle time to schedule sootblowing of a boiler (10) is predicted using on line process measurements. The optimum cycle times dynamically adjust to changing conditions resulting from boiler operation, fuel changes, or seasonal changes. The optimum cycle time is calculated four times per second for each heat trap (12, 13, 14, 16, 18) of the boiler (10). The optimum conditions are based on economic criteria which account for heat trap fouling, rate of fouling of other heat traps within the boiler, and on line boiler incremental steam cost.</p>
申请公布号 IN160086(B) 申请公布日期 1987.06.27
申请号 IN1983CA96619 申请日期 1983.08.03
申请人 THE BABCOCK & WILCOX COMPANY 发明人 MOSS WILLIAM HARRIS;POPIEL LAWRENCE;SCHEIB THOMAS JOSEPH
分类号 F23J3/00;F22B37/56;G05B13/02;(IPC1-7):F23J3/00 主分类号 F23J3/00