发明名称 |
Level double floor on solidifying fluid filled tubes - has holes cut at levelling marks for filler escape |
摘要 |
<p>Support elements are formed by filling tubular pieces with a fluid, self-levelling, hard-setting substance. The tubes are first joined to the underfloor (1) by a rapidly solidifying substance, in construction of a double floor. When individual tubular pieces (2) have been aligned, externally visible level marks are applied, in a horizontal plane dictated by the finished double floor level. At these points holes (6) are made in the tube sides, and a filling (3) is poured in until the substance emerges from the holes. Tubes can have bottom outward-protruding flanges (2).</p> |
申请公布号 |
DE3022776(A1) |
申请公布日期 |
1982.01.07 |
申请号 |
DE19803022776 |
申请日期 |
1980.06.18 |
申请人 |
HOELLFRITSCH,ERICH,DIPL.-VOLKSW. |
发明人 |
HOELLFRITSCH,ERICH,DIPL.-VOLKSW. |
分类号 |
E04F15/024;(IPC1-7):04F15/024 |
主分类号 |
E04F15/024 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|