发明名称 Level double floor on solidifying fluid filled tubes - has holes cut at levelling marks for filler escape
摘要 <p>Support elements are formed by filling tubular pieces with a fluid, self-levelling, hard-setting substance. The tubes are first joined to the underfloor (1) by a rapidly solidifying substance, in construction of a double floor. When individual tubular pieces (2) have been aligned, externally visible level marks are applied, in a horizontal plane dictated by the finished double floor level. At these points holes (6) are made in the tube sides, and a filling (3) is poured in until the substance emerges from the holes. Tubes can have bottom outward-protruding flanges (2).</p>
申请公布号 DE3022776(A1) 申请公布日期 1982.01.07
申请号 DE19803022776 申请日期 1980.06.18
申请人 HOELLFRITSCH,ERICH,DIPL.-VOLKSW. 发明人 HOELLFRITSCH,ERICH,DIPL.-VOLKSW.
分类号 E04F15/024;(IPC1-7):04F15/024 主分类号 E04F15/024
代理机构 代理人
主权项
地址