摘要 |
PURPOSE:To carry out automatically sequential works of the computer only by the setting of the operating commencement time by operating the power source portion when previously set time comes, and providing the clock portion for commencing the action of the starting control and the interface portion. CONSTITUTION:The operation beginning and work beginning time of the system is set beforehand in the clock portion 2 disposed in the computer system operating device 1, when the setting time comes, in accordance with the output signal from the clock portion 2, the power source portion 3 is started. When the power source portion 3 is turned on, the action of the control portion 4 is started. Then, the operating command is given to the respective interface portions 5, 6, 7 of the sequential constant voltage constant frequency power source CVCF, the air conditioner and the temperature and humidity detector and the CVCF, the air conditioner and the temperature and humidity detector 12 and the air conditioner 11 are sequentially brought into the operating state. When the operating condition of the respective portions being under the predetermined condition is recognized by the control portion 4, a command for starting the electric computer is given to the power source control portion 8 and the system starting control portion 9 from the control portion 4 to start the sequential computing work by the system 13 automatically. |