METHOD OF ASSEMBLING BRIDGE |
摘要 |
a side span connected by means of a plurality of blocks and delivered by using a ship to a place to be installed; a plurality of first sheaves installed on first and second cables which connects a power and an anchorage; a plurality of second sheaves installed on the side span; first and second wire ropes passing through the second sheaves of the side span and the first sheaves of the first and second cables and wound and lifted by a winch, such that the side span is pushed by means of a push full system and is installed between the tower and the anchorage by a hanger wire rope of the first and second cables; a middle span connected by means of the plurality of blocks and delivered by using the ship to the place to be installed; the plurality of first sheaves installed on first and second cables which connects the power and the anchorage; the plurality of second sheaves installed on the middle span; and a third wire rope passing through the second sheaves of the middle span and the first sheaves of the first and second cables and wound and lifted by a windlass or the winch, such that the middle span is installed between the towers by the hanger wire rope of the first and second cables.
|
申请公布号 |
KR950014588(B1) |
申请公布日期 |
1995.12.09 |
申请号 |
KR19920013730 |
申请日期 |
1992.07.31 |
申请人 |
DAEWOO SHIPPUILDING TECHNICAL CO., LTD. |
发明人 |
O, KI - CHOL;KIM, NAM - BAE;SHIN, DO - YUL;KIM, BONG - SUK |
分类号 |
E01D11/00;(IPC1-7):E01D11/00 |
主分类号 |
E01D11/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|