发明名称 |
PRODUCTION MANAGEMENT METHOD, PRODUCTION MANAGEMENT SYSTEM, AND PRODUCTION MANAGEMENT PROGRAM |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a production management method, a production management system, and a production management program for observing date of delivery promised to a customer even when there is a period of suspension to be a bottleneck in one production line comprising a plurality of manufacturing processes. <P>SOLUTION: The production management method includes: a lead time storage step S200 for storing a lead time in production record of a plurality of lots in respective manufacturing processes in one production line comprising a plurality of manufacturing processes; a lead time setting step S210 for setting a target lead time for each manufacturing process on the basis of the lead time in the production record; a suspension period calculation step S220 for calculating a period of suspension to be the bottleneck in the respective manufacturing processes; and a completion scheduled date setting step S230 for setting a completion scheduled date in respective manufacturing processes which are yet to be started for every lot by adding the period of suspension to the target lead time with a production completion day of a lot in progress as a starting point. <P>COPYRIGHT: (C)2010,JPO&INPIT</p> |
申请公布号 |
JP2010020665(A) |
申请公布日期 |
2010.01.28 |
申请号 |
JP20080182381 |
申请日期 |
2008.07.14 |
申请人 |
SEIKO EPSON CORP |
发明人 |
HANAOKA TAKAYUKI;GOMI SHUN |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|