摘要 |
PROBLEM TO BE SOLVED: To enable an inverter control part to be ON/OFF controlled under wireless control even though an additional installation is applied without making any substantial modification of an existing multistory building air conditioning facility, enable a power consumption to be more efficiently reduced and adjusted as compared with that of ON/OFF control of an air conditioner main body, and enable output reduction control to be carried out along with demand control.SOLUTION: This invention relates to a multistory building air conditioning system in which the air conditioner is operated through inverter control and ON/OFF control of the inverter control is carried out under a super high frequency through a relay unit.SELECTED DRAWING: Figure 1 |