发明名称 Underwater support concrete structure construction method
摘要 Disclosed is a construction method of a foundation for an underwater support structure, which is capable of rapidly installing the foundation of a large-scale structure on a sea floor, and also sufficiently ensuring a horizontal load supporting capability. The construction method includes installing a pile having a head part, in which a catching groove is formed, in a sea floor G; fabricating the foundation for the underwater support structure, in which a buried guide tube is formed to protrude downwardly from a lower surface of the foundation for an underwater support structure, and settling the foundation for the underwater support structure on the sea floor, such that the head part of the pile is inserted into the guide tube; and anchoring the pile into the guide tube using an elastically protruding settlement device formed in the guide tube.
申请公布号 US9435096(B2) 申请公布日期 2016.09.06
申请号 US201414548447 申请日期 2014.11.20
申请人 DONG MYEONG ENGINEERING CONSULTANTS & ARCHITECTURE 发明人 Shin Hee Jeong;Lee Young Jun;Kim Seong hwan
分类号 E02B17/02;E02D27/42;E02D27/10;E02D27/52;E02D27/50;E02D27/16;E02B17/00 主分类号 E02B17/02
代理机构 Lex IP Meister, PLLC 代理人 Lex IP Meister, PLLC
主权项 1. A construction method of a foundation for a underwater support structure, comprising: (a) installing a pile (200) having a head part (210), in which a catching groove (220) is formed, in a sea floor; (b) fabricating the foundation (100) for the underwater support structure, in which a buried guide tube (110) is formed to protrude downwardly from a lower surface of the foundation (100), and settling the foundation (100) for the underwater support structure on the sea floor, such that the head part of the pile (200) is inserted into the guide tube (110); (c) anchoring the pile (200) into the guide tube (110) and the guide tube (110) penetrates the sea floor; using an elastically protruding settlement device (300) formed in the guide tube (110); and (d) injecting a filler (400) into the guide tube and onto the sea floor under the foundation for the underwater support structure through an injection port (130) configured to extend from a surface of the foundation (100) for the underwater support structure into the guide tube, wherein the elastically protruding settlement device (300) comprises an elastic spring (320) installed in a horizontal hole (140) which is previously formed in the foundation (100) for the underwater support structure; and a stopper (310) set so that a surface of one side end thereof is in contact with the elastic spring (320) and a pin-jointed roller (330) is formed at a surface of the other side end thereof, which protrudes into the guide tube.
地址 Hwaseong-Si KR