发明名称 OVERLOAD LIMITATION IN PEAK POWER OPERATION
摘要 An exemplary method for operating a converter to supply electrical power to a load includes controlling the converter for a provided overload time so that overload power is applied to the load, and controlling the converter for a provided resting time, so that resting power is applied to the load. The overload power is higher than a nominal power which corresponds to a steady-state operation limit of the converter, wherein the resting power is lower than the nominal power.
申请公布号 EP2880752(B1) 申请公布日期 2016.12.21
申请号 EP20130740238 申请日期 2013.07.18
申请人 ABB Schweiz AG 发明人 SIEMASZKO, Daniel;ECKERLE, John;DOUZDOUZANI, Ata;RUETTEN, Klaus
分类号 H02M1/32 主分类号 H02M1/32
代理机构 代理人
主权项
地址