摘要 |
PROBLEM TO BE SOLVED: To provide a construction method that shortens a construction period for a chimney having an exterior wall configured as a membrane structure.SOLUTION: A unit structure includes: a framework member that forms a framework in a predetermined three-dimensional shape from vertical and horizontal members 2a and 2c; a floor material and a chimney member 3, which are integrally attached to the framework member; an exterior wall membrane 8 for covering an outer periphery of the framework member; and a support member 7 that is attached to the framework member so that the exterior wall membrane 8 can be supported on the framework member. The unit structures are stacked. The framework members of the stacked unit structures are joined together, and the chimney members 3 of the stacked unit structures are joined together. Subsequently, integration of the framework member with the chimney member 3 is released. |