发明名称 鉄骨構造物製作方法
摘要 <P>PROBLEM TO BE SOLVED: To solve the problem that a conventional construction steel frame column-beam joint part was complicated and required much time and efforts for production by cutting and assembling angular steel pipe columns for each building floor according to a through-diaphragm system, thereby deteriorating and deforming a diaphragm outer peripheral portion, a massive welding amount was required for electroslag welding between a tetrahedral steel pipe (tetrahedral box) column and a diaphragm even without cutting the column for each floor, and the diaphragm and the column were welded with super large heat input, thereby easily cracking or deteriorating the column. <P>SOLUTION: An angular steel pipe column is not cut for each floor but is welded with an inner diaphragm terminal portion via a through hole under a small welding amount/low heat input. Further, an H-shaped steel beam is welded and joined by one welding part of a multi-layer fill while including a through-hole welded portion. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP5932567(B2) 申请公布日期 2016.06.08
申请号 JP20120180591 申请日期 2012.08.16
申请人 株式会社アークリエイト 发明人 内田 昌克;岩郷 俊二;岩郷 速雄
分类号 E04B1/24;E04B1/58 主分类号 E04B1/24
代理机构 代理人
主权项
地址