发明名称 Automated demand response scheduling to reduce electrical loads
摘要 A system and method for reducing an electrical load in a facility with a building automation system, includes first receiving information for a demand response event from an automated demand response server at an automated demand response client. After receipt of a new demand response event, the system determines a plurality of devices of the building automation system to be controlled during the demand response event. Next, the system prepares a schedule of control actions for the plurality of devices during the demand response event. The system then sends control messages to the building automation system to execute the control actions for the plurality of devices according to the schedule of control actions for the demand response event.
申请公布号 US9310786(B2) 申请公布日期 2016.04.12
申请号 US201113163143 申请日期 2011.06.17
申请人 Siemens Industry, Inc. 发明人 Imhof Raphael;Songkakul Pornsak;Marchi Michael J.;Rule Thomas;Hiller Paula;Ersch Florian
分类号 G06F1/28;G05B15/02 主分类号 G06F1/28
代理机构 代理人
主权项 1. A method of reducing an electrical load in a facility with a building automation system, the method comprising: receiving a demand response message related to a demand response event via a computer connected to a network, the demand response message identifying at least one demand response mode for the demand response event; determining at least one device of the building automation system to be controlled during the demand response event based on an association between the at least one device and the at least one demand response mode for the demand response event; responsive to receiving the demand response message, automatically generating a schedule of a plurality of control actions for the at least one device for execution in association with the demand response event, wherein the schedule of control actions is generated based at least in part on a demand response control period associated with the plurality of the control actions; determining whether at least one schedule conflict exists for a first control action and a second control action from the schedule of control actions, wherein execution of the first control action would cause the at least one device to operate differently than the second control action during the associated demand response control period; and sending control messages to the building automation system to execute the control actions for the at least one device according to the schedule of control actions for the demand response event.
地址 Alpharetta GA US