摘要 |
A method can include receiving a model of a network of a production system that includes information that specifies branches and pieces of equipment; processing, optionally in parallel, at least a portion of the information for at least a portion of the model of the network; and, based at least in part on the processing, assigning a flow direction to each of the branches in the at least a portion of the model of the network. Various other technologies, techniques, etc., are also disclosed. |