摘要 |
<p><P>PROBLEM TO BE SOLVED: To create work plans of transport facilities and loading facilities for carrying in and out products in a warehouse including a plurality of ridges altogether at a time within practical time. <P>SOLUTION: A work allocation unit 13b allocates work plans of transport facilities and loading facilities relating to a plurality of ridges in a plan target period, and then allocates work plans of transport facilities and loading facilities relating to only individual ridges. That is, the work allocation unit 13b creates a work plan at two states, i.e., the processing for creating work planes of transport facilities and loading facilities relating to the plurality of ridges and the processing for creating work plans of transport facilities and loading facilities relating to only the individual ridges. According to such warehouse work plan creation processing, the number of combinations retrieved by one work plan creation operation is reduced. Thus, work plans of the transport facilities and the loading facilities for carrying in or out the products in the warehouse including a plurality of ridges are created altogether at a time within practical time. <P>COPYRIGHT: (C)2012,JPO&INPIT</p> |