摘要 |
<p>The invention relates to a method for correcting the height of a fixed railway track (1), wherein the sleepers (4, 5) supporting the tracks (6, 7) are embedded in a track plate (2) which is arranged on the foundation (3). Said method comprises the following steps: the track plates (2) are separated from the base on the common contact surface (9), filling openings (10), which extend from the upper side to the lower side of the track plate (2), are applied thereon, the track plate (2) is lifted until a desired height is reached, a liquid sealing material (11) which fills the free chamber between the track plate (2) and the foundation is introduced through the filling openings (10) and pressure surges are separated.</p> |