发明名称 METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING
摘要 FIELD: oil and gas industry. ^ SUBSTANCE: well is killed, tubing string is removed, sand plug is washed and collapse of production string is improved. Section of pipes is lowered to straightened production string thus covering the T/pay with no admittance of its shoe to head of washed sand plug for 1-2 m. Section of pipes is cemented with its being pressed to the head of sand plug, and after WOC there performed is cementing of inner cavity of section of pipes. Well shaft above cemented section of pipes is filled with killing fluid and cement bridges are installed at shoes of technical columns and surface pipe. Well shaft is filled with killing fluid between cement bridges, and at the interval of permafrost formations with non-freezing solution. Wellhead equipment is removed and concrete stand with datum point is installed. Or blind plug is installed in well shaft, inner cavities of wellhead equipment are filled with cement solution above blind plug, and side taps and upper flange of wellhead equipment is sealed with blind flanges with installation of datum point. ^ EFFECT: reliable well abandonment at minimum capital costs. ^ 2 dwg
申请公布号 RU2403376(C1) 申请公布日期 2010.11.10
申请号 RU20090136099 申请日期 2009.09.29
申请人 KUSTYSHEV IGOR' ALEKSANDROVICH 发明人 KUSTYSHEV IGOR' ALEKSANDROVICH;KUSTYSHEV DENIS ALEKSANDROVICH
分类号 E21B33/13 主分类号 E21B33/13
代理机构 代理人
主权项
地址