发明名称 ENERGY MANAGEMENT SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide an energy management system capable of giving a precise charge/discharge instruction to a hybrid PCS.SOLUTION: The energy management system has an over charge/discharge risk storage and a power generation and charge optimum scheduling section. The over charge/discharge risk storage stores an over charge/discharge risk which represents a risk of overcharge or over-discharge on a power storage unit by a hybrid power conditioner that converts a DC power input from a power generator or a power storage unit into an AC power to output the AC power to a power distribution system; and coverts an AC power input from the power distribution system into a DC power to output the DC power to the power storage unit. The power generation and charge optimum scheduling section calculates a control schedule value of the charge/discharge to/from the power storage unit by the hybrid power conditioner based on at least the over-charge/over-discharge risk, a power demand prediction, and power generation amount prediction of the power generator by the hybrid power conditioner.
申请公布号 JP2015149840(A) 申请公布日期 2015.08.20
申请号 JP20140021690 申请日期 2014.02.06
申请人 TOSHIBA CORP 发明人 KATAYAMA KYOSUKE;SUYAMA AKIHIRO;KUBOTA KAZUTO;MATSUE KIYOTAKA;WADA TAKAHISA;NAGAIWA AKIHIRO;TAIRA HIROSHI;YAMAGISHI HIROYUKI
分类号 H02J3/46;H02J3/00;H02J3/32;H02J7/34 主分类号 H02J3/46
代理机构 代理人
主权项
地址
您可能感兴趣的专利