摘要 |
PROBLEM TO BE SOLVED: To provide an air-conditioning facility for a building that can restrain breakage or deformation from occurring in an air-conditioning duct and a blowoff chamber. ! SOLUTION: A building is provided with an air-conditioning facility, and the air-conditioning facility comprises: an air-conditioning duct 32 through which air-conditioning air for air-conditioning a living room 15 flows; and a blowoff chamber 33 that is connected to the air-conditioning duct 32 and blows the air-conditioning air flowing through the air-conditioning duct 32 into the living room 15. The air-conditioning duct 32 and the blowoff chamber 33 are fixed to a partition wall 18, etc. of the building respectively. The air-conditioning duct 32 and the blowoff chamber 33 are not connected to each other, and thereby can move relatively to each other. The air-conditioning duct 32 and the blowoff chamber 33 include opposed surfaces opposed to connecting directions of the two, and an airtight member 82 having elasticity i |