<p>A method and system is provided for minimizing delays in a magnetic ranging method. Delays are minimized by establishing synchronicity between triggering of a three-axis magnetometer and energisation of a solenoid assembly deployed in the borehole being drilled and the first borehole, respectively. Synchronicity enables measuring various components of the alternating magnetic field created by energisation of the solenoid assembly by the magnetometer, the moment the solenoid assembly is energised. The recorded components are used for computation of steering data for drilling the second borehole relative to the first borehole. The steering data can be determined at the surface or downhole.</p>
申请公布号
CA2815877(C)
申请公布日期
2015.04.28
申请号
CA20112815877
申请日期
2011.03.17
申请人
PRECISION ENERGY SERVICES, INC.
发明人
WISLER, MACMILLAN M.;AIELLO, ROBERT A.;BINFORD, TOMMY L., JR.;COLLINS, HARRY MITCHELL;ELMORE, JAMES DOUGLAS;MARTIN, JOHN D.