摘要 |
PROBLEM TO BE SOLVED: To provide a concrete curing method capable of reducing consumption energy while securing sufficient thermal capacity when placed concrete is cooled and cured.SOLUTION: In a concrete curing method, a ventilation space 11 is formed in a form 1 for concrete placement, and cooling air for cooling placed concrete C is circulated through the ventilation space 11. Air cooling mechanisms 6 and 7 utilizing heat of vaporization of water are arranged in cooling air circulation paths 4, 5 and 11. The air cooled by the air cooling mechanisms 6 and 7 is circulated through the ventilation space 11. |