发明名称 METHOD FOR PREDICTION OF INHIBITION DURABILITY INDEX OF SHALE INHIBITORS AND INHIBITIVE DRILLING MUD SYSTEMS
摘要 Embodiments of a method used for determination of inhibition durability index (IDI) of an inhibitive mud system can include multiple stages, with each stage including specific steps. The first stage can include a dispersion test that evaluates the inhibition effects of a stability inhibitor after exposing the test material to the inhibitor. The second stage can include a durability inhibition assessment, which includes assessing the longevity of the effect of the inhibitor. A third stage can be used to graph or otherwise evaluate the results of the second stage or the first and second stages.
申请公布号 US2014295559(A1) 申请公布日期 2014.10.02
申请号 US201313854638 申请日期 2013.04.01
申请人 SAUDI ARABIAN OIL COMPANY 发明人 Amanullah Md;Al-Arfaj Mohammed;Al-Ansari Adel
分类号 G01N3/56 主分类号 G01N3/56
代理机构 代理人
主权项 1. A method of evaluating a shale inhibitor, the method comprising the steps of: (a) combining a predetermined quantity of drilling fluid and a predetermined quantity of earth material to define a first test mixture; (b) placing the first test mixture in a first hot roll cell; (c) rolling the first hot roll cell having the first test mixture in a hot roll oven at a first preselected temperature for a first predetermined amount of time; (d) removing from the first test mixture material smaller than a preselected size, the remaining material defining a first remaining material; (e) drying the first remaining material; (f) weighing the dried first remaining material; (g) combining at least a portion of the dried first remaining material with a non-inhibitive fluid to define a second test mixture; (h) placing the second test mixture in a second hot roll cell; (i) rolling the second hot roll cell having the second test mixture in the hot roll oven at a second preselected temperature for a duration time (t); (j) removing from the second test mixture material smaller than a second preselected size, the remaining material defining a second remaining material; (k) drying the second remaining material; (l) weighing the dried second remaining material; and (m) recording the weight of the dried second remaining material.
地址 Dhahran SA