摘要 |
There is provided a hydropower plant having a flow passage (40) in the form of an S-pipe and having first, second and third portions (100, 200, 300). The flow passage (40) has a first diameter (400) and a first center line (410) in the first portion and a second diameter (500) and a second center line (510) in the third portion (300). A spacing (600) is provided between the first and second center lines. The hydropower plant further has turbine blades (10) in the first portion (100) and a generator (30) coupled to the turbine blades (10) by a shaft (20) in the third portion (300). The flow passage (400) substantially comprises steel in the region of the generator (30). |