摘要 |
<p>The method comprises: filling the barriers (2) built on flooded or non-flooded floor formworks (1) with sand to a level that is above the required level of solidification of the sand mass (2b); and injecting nanometric silicon or calcium suspension at the sand mass, which penetrates into the underlying sandy soil and to the formworks, using vertical injectors (2a). Tight containers are connected to the formworks for creation of artificial barriers on flooded soil. The sand mass in the upper layer of inside of the formworks is solidified by bonding agents, prior to the injection step.</p> |