摘要 |
<p>A method of installing at least one cable, tube or cable-guide (2; 102; 202) inside a receiving duct (1; 101; 201) comprises the steps of laying the at least one cable, tube or cable-guide (2; 102; 202) inside and along the receiving duct (1; 101; 201). Then, a flowable and hardenable medium (5; 205) is applied to the at least one cable, tube or cable-guide (2; 102; 202) so that the flowable and hardenable medium (5; 205) forms a bond between the at least one cable, tube or cable-guide (2; 102; 202) and the receiving duct (1; 101; 201) when the flowable and hardenable medium (5; 205) has hardened. The flowable and hardenable medium (5; 205) can be applied on the at least one cable, tube or cable-guide (2; 102; 202) after they have been positioned by means of an application device (50, 150, 250). In the case of tubes or cable-guides, cables can successively be threaded therethrough to complete the installation.</p> |