摘要 |
<p>An object of the present invention is to provide a peak cut system which can reduce the running cost of a power-generating device even when a peak cut process is carried out. In a peak cut system (100) according to the present invention, a control unit (3) executes such a control procedure that a peak cut process is first carried out only by the discharge from a power storage device (2) and the power generation by a power-generating device (5) is carried out only when a predetermined amount of peak cut cannot be achieved only by the discharge from the power storage device (2).</p> |