发明名称 EARTH RETAINING PIPE FOR FORMING ARRIVAL PIT, AND METHOD FOR CONSTRUCTING UNDERGROUND CONDUIT LINE BY USING THE SAME
摘要 PROBLEM TO BE SOLVED: To provide an earth retaining pipe for forming an arrival pit applicable in various construction sites including hard earth sites, and a method for constructing an underground conduit line.SOLUTION: An inventive earth retaining pipe 1 for forming an arrival pit includes a tubular member 2, a cut-off rubber 3, a cut-off rubber support member 4 provided in the inside of the tubular member 2, and soil cutting members 5 provided at a tip of the tubular member 2. A pipe insertion hole 8 is formed in the cut-off rubber 3, and a propulsion pipe entry space 9 is formed between an inner wall of the tubular member 2 and the cut-off rubber 3. When a sheath pipe x passes through the pipe insertion hole 8 and is connected to the earth retaining pipe 1 for forming the arrival pit, a connection part between the sheath pipe x and the earth retaining pipe 1 for forming the arrival pit is sealed by the cut-off rubber 3.
申请公布号 JP2014037733(A) 申请公布日期 2014.02.27
申请号 JP20120181268 申请日期 2012.08.19
申请人 M-TEC CO LTD 发明人 TANIMOTO FUTOSHI
分类号 E21D9/06;F16L1/024 主分类号 E21D9/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利