发明名称 |
ERROR MANAGEMENT METHOD OF CONSTRUCTION MACHINERY FOR PROVIDING INFORMATION OF CURRENT OPERABLE WORKS |
摘要 |
PURPOSE: A construction equipment failure managing method is provided to analyze failure information when an abnormality occurs in construction equipment and notify an operator of a currently possible task part. CONSTITUTION: A controller area network (CAN) interface (202) communicates with multiple vehicle control devices through CAN. A communications module (204) transmits state information of the vehicle control devices to a neighboring communications terminal or to a control server. A control part (208) requests state information from the multiple vehicle control devices and transmits failure information to the communications terminal or the control server through the communications module. The control part receives data containing the failed portion of construction equipment and the range of a currently possible task through the communications module. The control part delivers the data to a dashboard through the CAN interface and displays the received data on the dashboard. A memory (206) stores state information received from the multiple vehicle control devices. [Reference numerals] (202) CAN interface; (204) Communications module; (206) Memory; (208) Control unit |
申请公布号 |
KR20130090002(A) |
申请公布日期 |
2013.08.13 |
申请号 |
KR20120008721 |
申请日期 |
2012.01.30 |
申请人 |
DOOSAN INFRACORE CO., LTD. |
发明人 |
KIM, JI HOON |
分类号 |
G06Q50/08 |
主分类号 |
G06Q50/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|