发明名称 Steam turbine installation and method for operating the steam turbine installation
摘要 <p>The installation has a steam turbine (5) having an overload bypass line (14) with which main steam is fed to a feed water pre-heating unit (11) between steam turbine input and extraction point (9) during overload operation of steam turbine. An auxiliary extraction line (17) is connected to overload bypass line in such a way that process steam is able to extract from the steam turbine during partial load operation of steam turbine so as to add extracted process stream to feed water pre-heating unit for additional pre-heating of feed water. An independent claim is included for method for operating steam turbine installation.</p>
申请公布号 EP2546476(A1) 申请公布日期 2013.01.16
申请号 EP20110174006 申请日期 2011.07.14
申请人 SIEMENS AKTIENGESELLSCHAFT 发明人 WECHSUNG, MICHAEL;GRAEBER, CARSTEN;LOEPER, THOMAS
分类号 F01K7/40;F01K13/02;F22D1/32 主分类号 F01K7/40
代理机构 代理人
主权项
地址