发明名称 |
Steam turbine installation and method for operating the steam turbine installation |
摘要 |
<p>The installation has a steam turbine (5) having an overload bypass line (14) with which main steam is fed to a feed water pre-heating unit (11) between steam turbine input and extraction point (9) during overload operation of steam turbine. An auxiliary extraction line (17) is connected to overload bypass line in such a way that process steam is able to extract from the steam turbine during partial load operation of steam turbine so as to add extracted process stream to feed water pre-heating unit for additional pre-heating of feed water. An independent claim is included for method for operating steam turbine installation.</p> |
申请公布号 |
EP2546476(A1) |
申请公布日期 |
2013.01.16 |
申请号 |
EP20110174006 |
申请日期 |
2011.07.14 |
申请人 |
SIEMENS AKTIENGESELLSCHAFT |
发明人 |
WECHSUNG, MICHAEL;GRAEBER, CARSTEN;LOEPER, THOMAS |
分类号 |
F01K7/40;F01K13/02;F22D1/32 |
主分类号 |
F01K7/40 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|